Vantage TX1
Running (some may still be expanding)
Vantage TX1 is an AI data center in San Antonio, Texas, developed or operated by Vantage Data Centers. Based on satellite imagery, its computers have an estimated 32 MW in operation today, against 128 MW planned.
U.S. average: 18.2¢ (+3.4%).
Statewide context, not this project’s effect: prices move for many reasons. Source: U.S. Energy Information Administration.
Satellite figures are Epoch AI estimates from imagery of buildings, cooling and power equipment; about 80% fall within a factor of 1.4 of the true value.
- Aug 31, 2027ScheduledSatellite analysis by Epoch AI · 128 MW planned
Estimated construction completion date of Building 2. Construction Project Filing
- Feb 15, 2026Satellite analysis by Epoch AI · 32 MW in use
Building 1 operational; Roads around Building 1 complete, all cooling and side generator equipment construction has since finished as well. Although this is still earlier than the completion date reported on TDLR, based on the appearance, we believe it is operational. Reported IT power of 32 MW. Source
- Dec 15, 2023Satellite analysis by Epoch AI · 0 MW in use
Land clearing begins for both Building 1 & Building 2
No hearings, court cases, approvals or disputes are on record for this project yet.
| Chip | Designer | Units | As of | Count is |
|---|---|---|---|---|
| B200 | Nvidia | 15,311 | Feb 15, 2026 | Estimate |
Source: Epoch AI, AI data centers, CC BY 4.0
Satellite and capacity estimates via Epoch AI (CC BY 4.0)
- Construction Permitting for TX11 tdlr.texas.gov
- Construction Permitting for TX12 tdlr.texas.gov
- Air quality permitting that references TX13 drive.google.com
- Epoch AI calculation sheet for this site
Satellite estimates: Epoch AI, CC BY 4.0, reformatted for this page.