Know Your Data Center

Insights

Power, chips, money, water and electricity prices at the largest AI sites.

Power running today
12.6 GW
32.8 GW scheduled by end of 2028
Capital cost online
$534B
Chips, buildings and power equipment
Share built so far
38%
Of planned power at satellite-measured sites
Top chipmaker
Nvidia
66% of installed compute
Most compute owned
Google
3.5M H100-equivalents running
Top US state
Texas
6.5 GW planned
US home electricity
18.2¢/kWh
+3.4% in a year · Virginia +11.3%
Deals tracked
19
Largest $500B: OpenAI and partners

Power online

12.6 GW today. Dashed line = scheduled.

Capital cost of capacity online

Chips plus buildings and power equipment, 2025 dollars

Who makes the chips

Share of installed compute (H100-equivalents) at tracked sites

  • Nvidia7.8M · 66%
  • Google2.8M · 24%
  • Amazon1.2M · 10%

Who owns the most compute

H100-equivalents running at sites each company owns

  • Google3.5M
  • Meta2.6M
  • Microsoft1.7M
  • Amazon1.5M
  • SpaceX (xAI)1.4M
  • Oracle1M
  • CoreWeave705K
  • QTS Data Centers600K
  • AI XPV Platform293K
  • Core4272K

Biggest power draws

Running now (solid) vs. planned (light)

  • Microsoft Fairwater Wisconsin369 MW / 2.3 GW
  • Anthropic-Amazon New Carlisle1 GW / 1.9 GW
  • OpenAI Stargate New Mexico0 MW / 1.8 GW
  • Meta Hyperion0 MW / 1.6 GW
  • Colossus 2946 MW / 1.5 GW
  • OpenAI Stargate Shackelford0 MW / 1.4 GW
  • QTS Cedar Rapids0 MW / 1.1 GW
  • Meta Prometheus471 MW / 1 GW
  • Goodnight0 MW / 1 GW
  • OpenAI Stargate Michigan0 MW / 988 MW

Power here means electricity used by the computers. Cooling and other losses add roughly 10–30% more.

Where it is going (US)

Planned power by state, at full build-out

  • Texas6.5 GW
  • Wisconsin3.2 GW
  • Indiana3 GW
  • Ohio2.9 GW
  • New Mexico2 GW
  • Tennessee2 GW
  • Iowa1.8 GW
  • Louisiana1.6 GW
  • Mississippi1.5 GW
  • Virginia1.4 GW
  • Nebraska995 MW
  • Michigan988 MW

How much is built

Satellite-measured sites: running vs. still to build

  • Operational (35)6.6 + 0 GW
  • Expanding (25)6.1 + 7.6 GW
  • Under construction (17)0 + 12.9 GW

Energy suppliers named

Ranked by planned power of the sites they serve

  • Entergy2.5 GW · 2 sites
  • WE Energies2.3 GW · 1 site
  • American Electric Power1.8 GW · 2 sites
  • Bloom Energy1.8 GW · 1 site
  • Williams1.6 GW · 3 sites
  • Alliant Energy1.1 GW · 1 site
  • Serena1 GW · 1 site
  • Dominion Energy658 MW · 3 sites
  • Georgia Power636 MW · 1 site
  • MLGW340 MW · 1 site

Most sites have no energy supplier on public record yet.

Home electricity prices in the top AI states

Average residential price, August 2026 vs. August 2025. States ranked by planned AI data center power.

StatePlanned AI powerExisting data centers mappedHome price nowA year earlierChange
Texas6.5 GW16615.9¢15.4¢+3.3%
Wisconsin3.2 GW1319.4¢18.4¢+5.3%
Indiana3 GW1817.0¢16.2¢+5.0%
Ohio2.9 GW7919.4¢17.6¢+10.4%
New Mexico2 GW1316.5¢16.0¢+3.3%
Tennessee2 GW2313.4¢13.1¢+2.5%
Iowa1.8 GW4217.1¢15.5¢+10.2%
Louisiana1.6 GW512.9¢12.6¢+2.5%
Mississippi1.5 GW814.4¢13.6¢+6.0%
Virginia1.4 GW36617.6¢15.8¢+11.3%
U.S. average18.2¢17.6¢+3.4%

Prices: U.S. Energy Information Administration, Electric Power Monthly (public domain). Existing data centers: OpenStreetMap via PNNL. This puts numbers side by side; it does not show that data centers caused any price change, which depends on fuel costs, grid investment, weather and regulation.

Water use (estimated)

Million gallons per day. Modeled from cooling equipment, not metered; few operators publish per-site water use.

ProjectLocationNowAt build-outPlanned power
Anthropic-Amazon New CarlisleNew Carlisle, IN21211.9 GW
Google Pryor (North)Pryor, OK2.2832.283368 MW
Google New AlbanyNew Albany, OH0.9660.966333 MW
AWS BerwickBerwick, PA0.1290.129169 MW
Google OmahaOmaha, NE0.0880.088395 MW
Google PapillionPapillion, NE0.0880.088237 MW
Meta KunaKuna, ID0.070.07152 MW
OpenAI Stargate New MexicoSanta Teresa (Doña Ana County), NM00.021.8 GW

Sites with an estimate of zero (closed-loop or air-cooled designs) are left out.

Major compute and infrastructure deals

Disclosed = announced by the companies or in filings · Reported = press reports only · Letter of intent = not binding

DateBuyerSupplierWhatGWValueBasisDetails
Aug 1, 2026AnthropicNscaleData center capacity0.46$45BReportedAbout $45B for 460 MW in West Virginia, per press reports. vktr.com
May 20, 2026AnthropicSpaceX (xAI)GPU cluster (Colossus)—$45BReportedAnthropic uses capacity at the Colossus sites in Memphis; ~$45B value reported, not disclosed. valueaddvc.com
Apr 20, 2026AnthropicAmazon (AWS)Trainium capacity5$100BReportedUp to 5 GW of new capacity; the >$100B over 10 years value is from press reports. anthropic.com
Apr 6, 2026AnthropicGoogle, BroadcomTPUs3.5—ReportedMulti-gigawatt TPU expansion starting 2027; the ~3.5 GW figure is from press reports. anthropic.com
Feb 24, 2026MetaAMDGPUs (Instinct)6—DisclosedDefinitive multi-year agreement to deploy up to 6 GW of AMD Instinct GPUs (AMD 8-K). sec.gov
Nov 18, 2025AnthropicMicrosoft, NVIDIACloud capacity + investment1$30BDisclosedAnthropic commits to $30B of Azure compute, up to 1 GW; NVIDIA to invest up to $10B and Microsoft up to $5B in Anthropic. anthropic.com
Nov 12, 2025AnthropicFluidstackData centers—$50BDisclosed$50B for custom data centers in Texas and New York, sites coming online through 2026. anthropic.com
Nov 3, 2025OpenAIAmazon (AWS)Cloud capacity (NVIDIA GPUs)—$38BDisclosed$38B multi-year agreement for AWS capacity with hundreds of thousands of NVIDIA GPUs. openai.com

Deal sizes are not additive: letters of intent, options and multi-year commitments overlap. Last reviewed Nov 14, 2026.