Google Pryor (North)
Running (some may still be expanding)
Google Pryor (North) is an AI data center in Pryor, Oklahoma, developed or operated by Google for Google DeepMind. Satellite imagery shows its computers drawing about 368 MW today.
U.S. average: 18.2¢ (+3.4%).
Statewide context, not this project’s effect: prices move for many reasons. Source: U.S. Energy Information Administration.
Satellite figures are Epoch AI estimates from imagery of buildings, cooling and power equipment; about 80% fall within a factor of 1.4 of the true value.
- Sep 6, 2026Satellite analysis by Epoch AI · 368 MW in use
Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.
- May 26, 2026Satellite analysis by Epoch AI · 53 MW in use
Building 2 looks almost complete, but still appears to have three cooling towers missing. We therefore expect another 3 months until full operation.
- Oct 19, 2025Satellite analysis by Epoch AI · 53 MW in use
The new substation for Building 2 looks mostly complete, half of the cooling towers are installed. The black patch in the top left of the building suggests that the new roof is not quite complete.
- Jan 28, 2025Satellite analysis by Epoch AI · 53 MW in use
Building 2 is being retrofitted from a warehouse. The roof is being painted white, and cooling towers and a new substation are being built just south of the building (based on later imagery).
- Jul 19, 2024Satellite analysis by Epoch AI · 53 MW in use
Building 1 is operational, based on default roof-to-operational time.
No hearings, court cases, approvals or disputes are on record for this project yet.
| Chip | Designer | Units | As of | Count is |
|---|---|---|---|---|
| TPU v5p | 23,466 | Jul 19, 2024 | Estimate | |
| TPU v5e | 77,886 | Jul 19, 2024 | Estimate |
Source: Epoch AI, AI data centers, CC BY 4.0
Satellite and capacity estimates via Epoch AI (CC BY 4.0)
- Google announces expansion of Pryor facility blog.google
- Google 2025 Environmental Report sustainability.google
- News of a 9 exaflop TPUv4 cluster in the Pryor data center, launched in 2022 techcrunch.com
- Epoch AI calculation sheet for this site
Satellite estimates: Epoch AI, CC BY 4.0, reformatted for this page.