Google Mesa is an AI data center in Mesa, Arizona, developed or operated by Google. Satellite imagery shows its computers drawing about 183 MW today.
U.S. average: 18.2¢ (+3.4%).
Statewide context, not this project’s effect: prices move for many reasons. Source: U.S. Energy Information Administration.
Satellite figures are Epoch AI estimates from imagery of buildings, cooling and power equipment; about 80% fall within a factor of 1.4 of the true value.
- Aug 15, 2026Satellite analysis by Epoch AI · 183 MW in use
Building 2 is operational. This is estimated based on the close-to-complete construction status from May 2026.
- May 15, 2026Satellite analysis by Epoch AI · 90 MW in use
Building 2 is close to being operational. There is only construction left on the backup generators, which are almost complete. Some equipment is also strewn around the building, especially near the air-cooled chillers. Preparation seems to have begun for Building 3 at the site.
- Sep 7, 2025Satellite analysis by Epoch AI · 90 MW in use
Building 2 roof is mostly completed. Building 2's backup generators are almost complete, and cooling is a little more than halfway complete. The Building 2 substation is also under construction.
- Jul 1, 2025Satellite analysis by Epoch AI · 90 MW in use
Building 1 is operational. This is based on the state of construction on 2025-03-02 as seen on Google Earth, where building shell and external components seems to have been completed, but there is still a lot of construction equipment present. That equipment appears to have been cleared up by this date, 4 months later, with the 2025-09-07 satellite imagery providing an upper bound. Construction has begun on the Building 2 roof, with work beginning on the areas for cooling and generators as well.
- Aug 1, 2023Satellite analysis by Epoch AI · 0 MW in use
Land clearing begins for the entire site.
No hearings, court cases, approvals or disputes are on record for this project yet.
| Chip | Designer | Units | As of | Count is |
|---|---|---|---|---|
| TPU v6e | 109,631 | Jul 1, 2025 | Estimate | |
| TPU v5p | 18,447 | Jul 1, 2025 | Estimate |
Source: Epoch AI, AI data centers, CC BY 4.0
Satellite and capacity estimates via Epoch AI (CC BY 4.0)
- DCD article on the site breaking ground datacenterdynamics.com
- DCD article on announcement to build Building 2 datacenterdynamics.com
- Epoch AI calculation sheet for this site
Satellite estimates: Epoch AI, CC BY 4.0, reformatted for this page.