Meta Los Lunas
Running (some may still be expanding)
Meta Los Lunas is an AI data center in Los Lunas, New Mexico, developed or operated by Meta for Meta. Satellite imagery shows its computers drawing about 118 MW today, against 218 MW planned.
U.S. average: 18.2¢ (+3.4%).
Statewide context, not this project’s effect: prices move for many reasons. Source: U.S. Energy Information Administration.
Satellite figures are Epoch AI estimates from imagery of buildings, cooling and power equipment; about 80% fall within a factor of 1.4 of the true value.
- Jan 1, 2028ScheduledSatellite analysis by Epoch AI · 218 MW planned
Building 3 is estimated to be operational. This is estimated from the timeline of similar buildings at other Meta sites.
- Oct 26, 2026Satellite analysis by Epoch AI · 118 MW in use
Building 2 (a tent like building) is operational. Based on a default estimate of 3 months for fit-out after structural completion in July.
- Jul 28, 2026Satellite analysis by Epoch AI · 87 MW in use
Building 2 (a tent-like building) shell is complete, but we don't believe it's operational because there is unpaved ground, no cars parked right in front, the first tent buildings at Meta Prometheus took about 16 months (it's been 10 months for this building). North-west of Building 1, the outline of a building of similar dimensions and style to Meta Jeffersonville's Building 1 is visible, this is labeled as Building 3. West of Building 1 we see more land clearing for what could be a building similar to Meta Jeffersonville's Building 2.
- Mar 1, 2026Satellite analysis by Epoch AI · 87 MW in use
Building 1 is operational, based on no construction activity around the shell and cooling equipment, and about 5 months passing after structural completion.
- Jul 24, 2024Satellite analysis by Epoch AI · 0 MW in use
Land clearing starts for new building.
No hearings, court cases, approvals or disputes are on record for this project yet.
| Chip | Designer | Units | As of | Count is |
|---|---|---|---|---|
| B300 | Nvidia | 53,061 | Oct 26, 2026 | Estimate |
Source: Epoch AI, AI data centers, CC BY 4.0
Satellite and capacity estimates via Epoch AI (CC BY 4.0)
- Meta fact sheet datacenters.atmeta.com
- Air quality permit for expansion drive.google.com
- Construction contractor page for the site fortisconstruction.com
- Epoch AI calculation sheet for this site
Satellite estimates: Epoch AI, CC BY 4.0, reformatted for this page.