Meta Montgomery
Running (some may still be expanding)
Meta Montgomery is an AI data center in Montgomery, Alabama, developed or operated by Meta for Meta. Satellite imagery shows its computers drawing about 153 MW today, against 358 MW planned.
U.S. average: 18.2¢ (+3.4%).
Statewide context, not this project’s effect: prices move for many reasons. Source: U.S. Energy Information Administration.
Satellite figures are Epoch AI estimates from imagery of buildings, cooling and power equipment; about 80% fall within a factor of 1.4 of the true value.
- Feb 23, 2027ScheduledSatellite analysis by Epoch AI · 358 MW planned
Buildings 3 and 4 are operational (estimate). In September 2025, Building 1 and 2 appeared to be in a similar state to Building 3 and 4 in May 2026. Based on that, we apply an 8-month delay to the Building 1 and 2 operational date to get the Building 3 and 4 operational date.
- Feb 2, 2027ScheduledSatellite analysis by Epoch AI · 204 MW planned
Buildings 5 and 6 are operational (estimate). Based on the tent buildings at Meta Prometheus taking about 12 months from starting the tent structure to estimated operation.
- Jun 18, 2026Satellite analysis by Epoch AI · 153 MW in use
We estimate Buildings 1 and 2 are operational.
- Mar 20, 2026Satellite analysis by Epoch AI · 0 MW in use
Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site and few cars in the front carpark, so we expect 3 more months needed for commissioning and server installation. Building 3 has a half-finished roof and Building 4 shell is beginning construction. Buildings 5 and 6 are under construction.
- Jul 4, 2025Satellite analysis by Epoch AI · 0 MW in use
Building 1 and 2 under construction, with all chillers visible.
- Mar 1, 2024Satellite analysis by Epoch AI · 0 MW in use
Land clearing begins.
No hearings, court cases, approvals or disputes are on record for this project yet.
| Chip | Designer | Units | As of | Count is |
|---|---|---|---|---|
| B300 | Nvidia | 69,074 | Jun 18, 2026 | Estimate |
Source: Epoch AI, AI data centers, CC BY 4.0
Satellite and capacity estimates via Epoch AI (CC BY 4.0)
- Meta Introduction to the Montgomery Project datacenters.atmeta.com
- Meta expansion announcement datacenters.atmeta.com
- Contractor announcement henselphelps.com
- Epoch AI calculation sheet for this site
Satellite estimates: Epoch AI, CC BY 4.0, reformatted for this page.